The El Temal suspended bridge is a 50 meter long bridge located within the municipality of Joyabaj, Guatemala. The bridge hangs over Rio Temal, and connects the community of El Temal and the surrounding area to the larger cities of Zacualpa and Chiche. Typically, this style of bridge can only accommodate pedestrians and motorcyclists, however, the bridge at El Temal was designed to be able to accommodate tuk-tuk traffic as well – the first of its kind to be built by an EWB chapter. Tuk-tuks are a popular mode of transportation in the area, but the existing route to the nearby cities was too long to be reasonable for tuk-tuks, and residents instead had to pay for a bus to take them the long way around. Approximately 5000 people will be impacted by the bridge as it will provide a direct link to the nearby highway, granting reliable, year-round access to schools, healthcare, markets, and additional economic development.

 

We would like to acknowledge the assistance of the EWB-Wisconsin Professional Partners on this project. They provided funds, design mentorship, and travel mentorship. This project would not have been possible without them.

Project Manager: Logan Bertling

Faculty Advisor: Todd Davis, Ph.D.

Responsible Engineer in Charge: Gary Raasch, PE, CFM

Structural Design Mentor: Mark Maday, PE

Geotechnical Design Mentor: John Siwula, PE

Water Resources Design Mentor: Gary Raasch, PE, CFM

Special thanks to Mike Paddock, Kevin Hagen, and Jay Edmundson for additional design & construction mentorship.